Skip to main content
Case Studies

Burntwood Court Hotel: 76% of site demand met by Solar PV and CHP

1 min readSaber Editorial, Editorial Team
Burntwood Court Hotel: 76% of site demand met by Solar PV and CHP

Solar PV and a CHP engine, funded by Saber under one PPA with zero capital outlay, have met around 76% of Burntwood Court Hotel’s site demand since March 2026.

At a glanceBurntwood Court Hotel
SectorHospitality
TechnologySolar PV and CHP
Capacity163 kW Solar PV, 50 kW CHP
Site demand metAround 76%
Funding100% Saber funded, zero capital outlay
StatusOperational since March 2026
Demand met and savings figures are Saber estimates.

The challenge

A hotel runs around the clock. Guests expect heating, hot water and power at every hour, which makes energy one of the largest and least flexible costs in the business.

Burntwood Court set out with three ambitions: cut its utility costs, keep heat consistent for guests, and build resilience against grid disruption.

The solution

Saber designed a blend of 163 kW of Solar PV and a 50 kW CHP engine, funded and operated under a single Power Purchase Agreement. The CHP engine supplies power and heat through the day and night, matching the hotel’s steady thermal demand, while Solar PV covers daytime load.

One contract and one point of accountability, with no capital outlay for the hotel.

The results

Solar PV and CHP have run together since March 2026. The blend meets around 76% of the hotel’s site demand from on-site generation, and Saber estimates the saving at about £950,000 over the term of the agreement.

Related Insights

Continue reading on related topics.

Hotels and spas carry constant heat and power demand. A blended PPA combining Solar PV, Hydrogen-ready CHP and BESS can reach up to 96 per cent system efficiency through heat recovery.

Put it to work

Get in touch to discuss how these insights apply to your business.

Our team is ready to help you navigate the renewable energy landscape and find the right solution for your organisation.