Healthcare & Public Sector

Continuous, mission-critical demand with island-mode resilience. Public-sector procurement and SECR reporting across single and multi-site estates.

Blended with thermal recovery

The challenge

Hospitals, care settings and public-sector estates run continuous, mission-critical demand where a loss of power is a safety issue, not an inconvenience. Budgets are constrained and procurement is governed, so capital projects are hard to fund. Reporting obligations such as SECR mean carbon performance has to be evidenced, not estimated, across single and multi-site estates.

How Saber addresses it

Saber designs a blended system with thermal recovery, sized to the site load and built for island-mode resilience so critical functions stay supplied if grid is lost. The PPA structure routes the project through an operating-expense line rather than a capital request, which fits public-sector procurement. Metered output gives defensible Scope 1 and 2 data for SECR reporting. The same model scales from a single site to a multi-site estate.

A day on site

What the blend does across a working day.

Site demand met by a blended, multi-technology design, with residual grid import at the shoulders. Every half-hour is metered, recorded and reported.

Solar PVHydrogen-ready CHPBESS dischargeResidual grid importTotal site demand
013,00026,00039,00052,000kW00:0006:0012:0018:0024:00Hour of dayHYDROGEN-READY CHP BASELOAD AROUND THE CLOCKday-one capacity ahead of the DNO queue
Indicative profile. Shapes derived from real anonymised half-hourly data; your figures are modelled from your own

Annual energy mix, healthcare & public sector

% of annual demand | 100% generated on site

SOLAR PV3%HYDROGEN-READY CHP98%BESS8%SITE DEMAND100%ROUND-TRIP LOSSES1%
Illustrative annual energy mix, shown as a share of site demand. Every unit generated on site is supplied at the contracted PPA rate rather than the grid rate, so savings scale with the on-site share. BESS is a routing stage, not a source: battery discharge is generated earlier by Solar PV or Hydrogen-ready CHP. Round-trip efficiency assumed at 88%; the on-site share is stated net of those losses and the generation bars are gross. Island-mode operation ahead of grid energisation; once the DNO connection is live the plant transitions to a peaking and resilience role.

Outcomes

Island-mode resilience

Island-mode resilience for continuous, mission-critical demand.

Thermal recovery efficiency

Thermal recovery improving overall system efficiency.

Operating-expense structure

Operating-expense structure suited to public-sector procurement.

Defensible SECR data

Defensible metered data for SECR reporting across single and multi-site estates.

Common questions

Renewable energy for healthcare & public sector

Where it starts

Find out what the blend looks like for healthcare & public sector.

Share 12 months of half-hourly data and a basic site pack. Saber returns an indicative blend, a savings range and a delivery timeline within one to two weeks.