A multi-megawatt transition as EV charging scales across the estate. Portfolio engagements that need one commercial pattern, not site-by-site procurement.

Hydrogen-ready CHP + Solar PV + BESS

60+ sites

Single-programme assessment

3 mo

Portfolio assessment timeline

1 to 2 wk

Single-site feasibility

The challenge

Motorway service areas face a multi-megawatt step-change in demand as EV charging scales. The new load arrives faster than the grid can reinforce, and DNO connection queues sit directly across the path of the charging ramp. Across a portfolio, the same problem repeats at every site, which makes site-by-site procurement slow and inconsistent.

How Saber addresses it

Saber assesses the estate as a single programme rather than a sequence of sites. Hydrogen-ready CHP, Solar PV and BESS are blended to handle day-one demand and the EV charging ramp under one structure, with Bridge to Grid removing the DNO queue from the critical path. A single-site feasibility takes roughly one to two weeks; a full portfolio assessment runs at roughly three months. Estates of this kind are assessed as one programme, not site by site.

See the Bridge to Grid model

A day on site

What the blend does across a working day.

Site demand met by Hydrogen-ready CHP, Solar PV, BESS, with residual grid import at the shoulders. Every half-hour is metered, recorded and reported.

Solar PVHydrogen-ready CHPBESS dischargeResidual grid importTotal site demand
0125250375500kW00:0006:0012:0018:0024:00Hour of dayHYDROGEN-READY CHP MATCHES THERMAL DEMANDhot water and leisure load from early morningEVENING PEAK SHAVEDstorage through service hours
Indicative profile. Shapes derived from real anonymised half-hourly data; your figures are modelled from your own

Annual energy mix, motorway services

% of annual demand | 60% generated on site

SOLAR PV18.5%HYDROGEN-READY CHP42%GRID IMPORT40%BESS4.5%SITE DEMAND100%ROUND-TRIP LOSSES0.5%
Illustrative annual energy mix, shown as a share of site demand. Every unit generated on site is supplied at the contracted PPA rate rather than the grid rate, so savings scale with the on-site share. BESS is a routing stage, not a source: battery discharge is generated earlier by Solar PV or Hydrogen-ready CHP. Round-trip efficiency assumed at 88%; the on-site share is stated net of those losses and the generation bars are gross.

Outcomes

One commercial pattern, estate-wide

One commercial pattern across the estate, not site-by-site procurement.

DNO queue removed

Bridge to Grid removes the DNO queue from the EV charging ramp.

One to two week feasibility

Roughly one to two weeks for single-site feasibility.

No capital outlay

No capital outlay across the portfolio.

Common questions

Renewable energy for motorway services

Where it starts

Find out what the blend looks like for motorway services.

Share 12 months of half-hourly data and a basic site pack. Saber returns an indicative blend, a savings range and a delivery timeline within one to two weeks.